Opel Vectra A

since 1988-1995 release

Repair and operation of the car



Vektr's Opel And
+ 1. Maintenance instruction
+ 1.1 Maintenance
+ 2. Engine
+ 3. Repair of DOHC engines
+ 4. Repair of the diesel engine
+ 5. Cooling system
+ 6. Fuel system
- 7. The fuel and exhaust system of models with system of injection of fuel
   7.2. General information
   7.3. Check of system of injection of fuel
   7.4. Air filter
   7.5. Air chamber
   7.6. The control unit of temperature of the air coming to the engine
   7.7. The sensor of temperature of the air coming to the engine
   7.8. Removal of pressure in fuel system
   7.9. The fuel filter on models with the fuel pump out of the fuel tank
   7.10. The fuel filter on models with the pump in the fuel tank
   7.11. Check of the fuel pump
   7.12. The fuel pump installed out of the fuel tank
   7.13. The fuel pump installed in the fuel tank
   7.14. Replacement of the relay of the fuel pump
   7.15. Pipe of a fuel-filling mouth
   7.16. Fuel tank
   7.17. Fuel level sensor
   7.18. Quencher of fluctuations of fuel
   7.19. Accelerator cable
   7.20. Check and adjustment of fuel mix on idling turns
   7.21. Fuel pressure regulator
   7.22. Regulator of turns of idling
   7.23. Sensor of provision of a butterfly valve
   7.24. Potentiometer of provision of a butterfly valve
   7.25. Air stream measuring instrument
   7.26. Measuring instrument of mass of a stream of air
   7.27. Tape measuring instrument of mass of a stream of air
   + 7.28. Fuel nozzles (except Multec)
   7.29. Fuel nozzle (Multec system)
   7.30. Check of a fuel nozzle (Multec system)
   - 7.31. The throttle case (except the Multec system)
      7.31.2. DOHC engines
   7.32. Throttle case (Multec system)
   7.33. Step engine of management of air supply (idling turns)
   7.34. Potentiometer of provision of a butterfly valve
   7.35. Electronic control device (ECU)
   7.36. Sensor of a detonation and module (X16 SZ models)
   7.37. Sensor of a detonation (Simtec system)
   7.38. An inlet collector (the SOHC engine without Multec)
   7.39. An inlet collector (the SOHC engine with Multec)
   7.40. Inlet collector (DOHC models)
+ 8. Exhaust system and system of decrease in toxicity of exhaust gases
+ 9. Fuel systems of the diesel engine
+ 10. Engine electrical systems
+ 11. Transmission
+ 12. Mechanical transmission
+ 13. Automatic transmission
+ 14. Power shafts
+ 15. Brake system
+ 16. Suspension bracket
+ 17. Body
+ 18. Electric equipment
+ 19. Check of malfunctions


24bec775


7.31. The throttle case (except the Multec system)

7.31.1. SOHC models

Removal

Detachment of a returnable spring of a butterfly valve from an arm on an inlet collector

Unscrewing of nuts of fastening of the case of a throttle

Removal of the case of a throttle on the SOHC models

PERFORMANCE ORDER
1. Remove a weight wire from the accumulator.
2. Weaken the collars fixing the main air branch pipe to the case of a throttle and the measuring instrument of a stream of air and remove a branch pipe.
3. Weaken a collar and disconnect a hose of the regulator of turns of idling from the throttle case.
4. Disconnect the hose of ventilation of a case going from a cover of a head of the block of cylinders to the throttle case.
5. Disconnect hoses of giving I cool liquid Russian cabbage soup from the case of a throttle and close the ends of hoses I cool with suitable traffic jams for reduction of loss liquid Russian cabbage soup.
6. Disconnect the electric socket from the sensor of provision of a butterfly valve.
7. Remove an accelerator cable from the lever of a butterfly valve.
8. Take a sealing ring of a cover of a cable of an accelerator from an arm on an inlet collector, then otsoyed to Nita a returnable spring of the gate from an arm (see rice. A detachment of a returnable spring of a butterfly valve from an arm on an inlet collector).
9. Check that all hoses and электричес sockets are disconnected by Kia from the throttle case.
10. Unscrew four nuts and remove the throttle case from an inlet collector (see rice. Unscrewing of nuts of fastening of the case of a throttle, Removal of the case of a throttle on the SOHC models). For access to the lower nuts of fastening of the case of a throttle move fuel hoses aside.
11. Remove laying of the case of a throttle.
12. If necessary remove the sensor of provision of a butterfly valve from the throttle case.

Installation

Installation of laying of the case of a throttle

PERFORMANCE ORDER
1. Installation is made in the sequence, the return to removal taking into account the next moments.
2. If acted, install the sensor of provision of a butterfly valve.
3. Install the throttle case with использо a vaniye of new laying (see rice. Installation of laying of the case of a throttle).
4. Check correctness and reliability of connection of hoses and electric sockets.
5. Check the level of cooling liquid and, if necessary, bring it to norm.
If necessary adjust an accelerator cable.