Opel Vectra A

since 1988-1995 release

Repair and operation of the car



Vektr's Opel And
+ 1. Maintenance instruction
+ 1.1 Maintenance
+ 2. Engine
+ 3. Repair of DOHC engines
+ 4. Repair of the diesel engine
+ 5. Cooling system
- 6. Fuel system
   6.2. General information
   6.3. Air filter
   6.4. The block of adjustment of temperature of the air coming to the engine
   6.5. Check of the fuel pump
   6.6. Removal and installation of the fuel pump
   6.7. Fuel tank
   6.8. Fuel level sensor
   6.9. Separator of vapors of fuel (l models 1,6 and 1,8)
   6.10. Accelerator pedal
   6.11. Accelerator cable
   6.12. Carburetor
   6.13. Removal and installation of the carburetor
   6.14. Adjustment of turns of idling and contents WITH
   6.15. Needle and float
   6.16. Vacuum diaphragm of a butterfly valve of the secondary camera
   6.17. Economizer diaphragm
   6.18. Accelerating pump
   6.19. Knot of the air automatic gate
   + 6.20. Vacuum blocks of movement of the air automatic gate
   6.21. Carburetor filter
   6.22. Adjustment of the shock-absorber of a butterfly valve
   6.23. Sensor of provision of a butterfly valve (automatic transmission)
   6.24. Valve check of increase in turns of idling
   6.25. The electromagnetic valve of idling on models of 1,8 l
   6.26. Inlet collector
+ 7. The fuel and exhaust system of models with system of injection of fuel
+ 8. Exhaust system and system of decrease in toxicity of exhaust gases
+ 9. Fuel systems of the diesel engine
+ 10. Engine electrical systems
+ 11. Transmission
+ 12. Mechanical transmission
+ 13. Automatic transmission
+ 14. Power shafts
+ 15. Brake system
+ 16. Suspension bracket
+ 17. Body
+ 18. Electric equipment
+ 19. Check of malfunctions


24bec775


6.26. Inlet collector

GENERAL INFORMATION

Prevention

At installation of an inlet collector it is necessary to use new laying.


Removal

Detachment of a hose of supply of cooling liquid from an inlet collector

Fastening of a hose of ventilation of a case to an inlet kollekto ру on models of 1,6 l

Removal of an inlet collector on models of 1,6 l

PERFORMANCE ORDER
1. Remove a weight wire from the accumulator.
2. Merge cooling liquid from the cooling system.
3. On early models remove the air filter. On later models disconnect the air duct from the air filter, then disconnect a vacuum tube and a hose of ventilation of a case from an air chamber. Unscrew three screws and remove an air chamber together with an air duct.
4. On models of 1,4 l disconnect the giving fuel hose from the carburetor, and on models 1,6 and 1,8 of l disconnect fuel hoses from a separator of vapors of fuel. Close the ends of hoses of a podkhodyashcha ми traffic jams.
5. Take a bracket, the fixing accelerator cable cover to an arm on the carburetor, then remove a sealing ring from an arm and disconnect an accelerator cable from the lever of a butterfly valve.
6. Mark and disconnect hoses of supply of cooling liquid from the case of the air automatic gate. Close the ends of hoses suitable traffic jams or enshrine them in the top provision for an exception of an effluence of cooling liquid.
7. Mark and disconnect vacuum tubes from a forward part of the carburetor.
8. Disconnect electric sockets from the carburetor.
9. Disconnect a hose of giving I cool liquid Russian cabbage soup from the back party of a collector (see rice. A detachment of a hose of supply of cooling liquid from an inlet collector).
10. In the presence disconnect the hose of ventilation of a case connecting a cover of a head of the block of cylinders and a back part of an inlet collector (see rice. Fastening of a hose of ventilation of a case to an inlet kollekto ру on models of 1,6 l).
11. Unscrew a connecting nut and disconnect a vacuum hose of the vacuum amplifier of brakes from an inlet collector.
12. On models 1,4 and 1,6 of l disconnect the electric socket from the sensor of the index of temperature.
13. Unscrew the top fastening генерато ра to an inlet collector.
14. On models 1,4 and 1,6 of l disconnect and remove a hose of ventilation of a case from a back part of a cover of a head of the block of cylinders.
15. Check that all hoses, pipes and electric sockets are disconnected from an inlet collector.
16. Unscrew nuts and remove an inlet collector from hairpins of a head of the block of cylinders (see rice. Removal of an inlet collector on models of 1,6 l).
17. If when unscrewing nuts of fastening of an inlet collector from a head of the block of cylinders hairpins were unscrewed, after removal of a collector screw in hairpins in a head of the block of cylinders.
18. If necessary remove the carburetor from an inlet collector.

Installation

PERFORMANCE ORDER
1. Installation is made in the sequence, the return to removal taking into account the next moments. If the carburetor was removed, install it on an inlet collector with new laying.
2. If from an inlet collector the arm of fastening of the generator unscrewed, establish it before installation of a collector.
3. Establish an inlet collector on a head of the block of cylinders with new laying and fix by nuts, having tightened them the required moment.
4. Check correctness of connection of hoses, pipes and electric sockets.
5. Fill in cooling liquid in the cooling system.
6. Check and, if necessary, adjust an accelerator cable.
7. If works on the carburetor were performed, check turns of idling and maintenance WITH in exhaust gases.